|
|
|
Diamond Tool's quality system is designed to assure that services and supplies manufactured at Diamond Tool or at our supplier's facilities are subject to adequate quality control to ensure customer satisfaction. Our system is designed to provide for early detection of discrepancies and afford positive corrective action. Our system encompasses identification, receipt, stocking, and the entire process of manufacturing, machining, fabrication, packaging, storage, and shipping. < FIRST ARTICLE INSPECTION First piece on each operation, during in-process is documented by the machinist on DTI Form 111, then verified and documented again on DTI Form 100 by Quality Assurance. If a problem is found by Inspection, the job will be shut down until correction is made and any discrepant parts will be scrapped or corrected as necessary. Complete First Article layouts are also performed with ballooned blueprints when required to customer's specifications on DTI Form 103, or Form AS9102. IN PROCESS INSPECTION In-process inspections will be performed and measured results documented at a 1.5% AQL by the machinist continuing on DTI Form 100 until job is complete to provide early detection of any nonconforming parts. The Quality Manager will be responsible for obtaining appropriate corrective and follow-up action to prevent recurrence of discrepant parts or material. RECEIVING INSPECTION Parts and materials shall be inspected upon receiving on our dock and results documented on DTI Form 102. They shall be inspected for size, quantity, and heat lot number. Then the results are compared to certifications, test reports, and packing slips. The inspection form will indicate acceptance or rejection. NONCONFORMING MATERIAL Parts and/or materials which are nonconforming shall be marked and/or tagged in a secure fashion identifying them as nonconforming, at which time a Discrepant Material Report on DTI Form 116 shall be completed and submitted to the purchasing department who is then responsible for obtaining a Corrective Action Report from the supplier. Any nonconforming parts produced in house will be identified on DTI FORM 108 and segregated from the normal flow of finished parts and rechecked prior to shipment. This form must be signed off by Q. C. before shipment to customer. ASSEMBLY INSPECTION AND/OR FUNCTIONAL TEST Assembly inspection and any functional testing required by contract, or any other tests required to ensure product quality will be performed. Inspection records will include: the number accepted, number rejected, date of inspection, and identification of the inspector. All inspection records will be maintained and available for government review. When functional testing or customer require government inspections the Government Representative will be notified in advance, informing him when and where the specified test will take place. All nonconforming parts or assemblies will be identified and moved to a segregated area. FINAL INSPECTION AND TEST Final inspection and tests will be performed at AQL of 1.5% or 100% or on a sample basis, whichever is applicable and documented on DTI Form 104. If source inspection is required on the purchase order the customer will be notified prior to final inspection. Inspection and test records will be maintained, and made available for review at the request of the customer. All nonconforming material will be identified, tagged, and segregated from the normal flow of finished material and documented on DTI Form 108. Nonconforming materials will not be released for shipment to the customer without specific instructions or a deviation from the customer and will be held in a designated area. Rejected material subjected to any repair will be resubmitted to final inspection for verification of the adequacy of the rework on DTI Form 108. Inspection records will include: the number of pieces accepted, number rejected, date of inspection, and identification of the inspector. MEASURING AND TEST EQUIPMENT All measuring and testing devices that are necessary to assure materials and parts conform to drawing requirements will be calibrated and maintained. Some are sent out to Gage calibration specialists (Gage Blocks) and some are done in house (calipers.) This includes company as well as personal employee owned gages. When required, measuring and test equipment will be made available for use by any Government Representative to determine conformance of product with contract requirements. In addition, personnel shall be made available for operation of such devices for verification of their accuracy and condition. All measuring and test equipment that is used for final inspection will be calibrated per MIL-STD-45662. Records of calibration, and the methods used shall be maintained and kept on file by the Quality Assurance Manager. Records shall be updated on a regular basis. GAGE CALIBRATION:
DRAWING AND SPECIFICATION CONTROL All parts will be assembled and/or manufactured to customer prints and specifications which will be filed by drawing number with the latest Revision. The Purchasing Controller will be responsible for the charging out and controlling of drawing/ specifications to the latest revision in conjunction with the Quality Manager. PACKAGING AND SHIPPING All packaging for each shipment will be verified to see that the proper items are being packaged and the packaging will be done in a secure manner to prevent shipping damage. Shipping containers will be inspected to assure that all required markings to parts or assemblies have been applied properly when required. RECORDS All records of inspection and tests will be maintained and kept on file for a minimum of 2 years and made available for review by the customer at any time customer wishes. Home | Services | Equipment | Location | Employment | Links | Contact Us |
|
Copyright © 1997-2011 Diamond Tool Inc. |